Looking Good – Long Ago

In 2017 we could never have guessed the extent of shoddy workmanship in our house. This photo diary shows the almost-complete house. Superficially the house was looking good but it did not have good bones and it did not stay good for long.

20170914 build progress
Through the piano window to the patio and beyond

Our eco house was to have been our forever home, eco and kind to the earth with double glazing, insulation and solar power. The eco pool frog-friendly and free of chemicals. And with the extra windows we installed there is natural light in abundance. But this dream has been shattered by an incompetent builder and a vexatious, litigious developer. The builder just does not accept responsibility for his shoddy workmanship.

Read our post on The Sad Reality and also Winter Blues to see how the house deteriorated in winter 2021. The leaking garage a fitting testimony to a cowboy builder.

20170902 kitchen-dining room
20170927 downstairs interior
2017927 stairway
20170927 reed bed
20170927 new grass lawn

The Cellar

20180220 cellar milky water
20181021 cellar damp
20180219 cellar drill holes

Late 2017 soon after the house was “finished” there was evidence of water ingress in the cellar. A reputable company was called in to sort out the (builder’s) mess. 

In February 2018 the waterproofing experts came in, drilled lots of holes and pressure pumped their chemicals into the wall. These chemicals could save the Gautrain tunnel and fix mines but no matter how many attempts were made in this cellar it did not work.

 

It seemed there was honeycombing in the concrete in the walls. As much as the waterproofers chased the leaks, they simply could not stop the water ingress.

The builder blames the waterproofers for the cellar problems. He doesn’t realise he caused the problems in the first place.

In fact, the builder never built the cellar to the engineer’s specifications. And, unfortunately the engineer signed off the cellar drain without actually seeing it and knowing it was not ideal.

The cellar got worse and worse until there was 500-600mm water standing. It was emptied and it refilled again.

20181021 cellar pools of milky water
20181218 base of cellar stairs
20181218 base of stairs

As the waterproofers worked on the cellar it became evident that the problem was far larger than originally thought.

20200126 flooded cellar with floating bucket

The waterproofers told the builder to remove all internal walls. He refused for months and eventually removed all walls to a height of about 1m.

20200408 cellar walls removed to 1m
20200408 cellar walls removed
20200702 cellar works, walls removed

During this remedial work the builder would not tell us anything of what they were doing and we were advised by our attorney to let them continue working as we should not be seen to be obstructive.

 

Shoddy Workmanship Around the House

20200126 rust at guest bedroom window
20200126 rusty cladding
20200130 another crack in the wall
20201012 rusty beading, patchy paint
20201012 bathroom wall
20201012 patchy paintwork
20201012 one of many cracked ceiling panels
20201012 shoddy workmanship in passage
20201012 patchy paintwork in guest toilet
20201017 damp re-appearing in cellar
20201012 shoddy workmanship
20201017 cracked top of reed bed wall
20201012 damp bubbling paint
20201017 one of many damp points in the house
20201017 Cracked garage ceiling
Damp in cellar getting worse
20210225 Bottom of cellar stairwell
20210225 Damp in dining room wall